East Boston Master Plan - Illustrations
Feasibility and analysis of preferred alternative - Workshop 3
(Please wait for all graphics to load)

Condor Street - Option 1 Remove the DPA


Condor Street - Option 2 Maintain the DPA


Liberty 1 - Option 1 Maintain the DPA


Liberty 2 - Option 2 Remove the DPA

Boston East: Option 1 - Marine Industrial and Major Cultural Use


Boston East: Option 2 - Residential and Minor Cultural Use


Triangular Intersection - Case Study in Jeffries Point


 


posted 3/19/99


EBOL Home Page